Parking Renovation
As well as exterior and interior, that scope of work includes rough grading and excavation, underground drainage and utilities, sub-grade base, asphalt or concrete paving, electrical light post, monument sign base, concrete curb gutters and swale, slurry finish if needed for renovation, general striping and signage.
Pictures:1 |
The Mall development redesigned the complete parking area to improve traffic to the mall. We removed approx.100, 000 sq.ft. and re-created a new parking system. Project cost $750,000 |
2 |
New Valet Parking area including valet counter and sitting area with Audio/Visual Advertising, new granite flooring, design element. Project cost $250,000 |
3 |
The project required individual drop-off area. To facilitate a quick access to the mall. Project cost $80,000 |
4 |
Access to general parking area was too congested. We created an additional traffic lane for access to the freeway including relocation of fire hydrant , storm drain, catch basin, traffic lights, all work coordinated with D.W.P., Building and Safety, Cal Trans, Public Works. Project cost $210,000 |
5 |
New curbs and sidewalk access. Access to the parking garage. Project cost $80,000 |
Pict. 1
Pict. 2
Pict. 3
Pict. 4
Pict. 5