Building Pads / Utilities

This scope of work includes excavation, grading, and compaction for the building pad and all utilities underground for development.

Pictures:
1
Within the parking area new building pads needed to be prepared to receive a new restaurant or retail store.  The Pad preparation included electrical underground feed, gas line, main sprinkler lines, data and phone conduit, all stubbed 10ft. from final Building layout.
Project cost $180,000
2
During the redevelopment of the Century City mall, the bus stop at Constellation Blvd. needed to be relocated 50 feet westward including all utilities and Bus shelter.
Project cost $85,000
3
Expansion of Topanga Mall required more electrical services.  DWP electrical transformer building was installed at the North End.  This included grading, concrete footings, masonry wall, concrete vault and #3 gravel finish.
Project cost $210,000
4
Complete improvement of outside patio dining area not including furniture.
Project cost $40,000
5
Patio paving, design elements and planters along main entry to create attractive mall entrance.
Project cost $105,000
6
The City of Santa Anita required the Mall to add a bus line stop for new services.  We provided all construction support to install this Patio paving, design elements and planters.
Project cost $115,000